Power Distribution

The required power distribution when using the DEBUGGER process in a larger operation is offered as standard in 3 different construction sizes/ configurations. But it is also possible to offer individual configuration.

6 x 32A
12 x 32A
16 x 32A

Debugger

Power Distribution

Ventilator

Volume flow [m3 / h]

Heating capacity [kW]

 

-

-

Electrical data

Output [kW]

Max. current consumption [A] 

Electrical connection ¹ [A] 

 

 

various sockets

Dimensions [L x W x H in mm]

1.200 x 400 x 1.200

Weight ²[kg]

70

All figures are valid for 400 V-3 Ph-50 Hz

1) According to CEE
2) Including cable and plug

Subject to technical changes.

Function of DEBUGGER process

The insect heat treatment makes use of the fact that insects die by protein coagulation at air temperatures of at least 45° C. This DEBUGGER process kills not only the adult insects but also their egg deposition and larvae. This method always makes sure that the room temperature during operation never rises above 60° C to prevent damage to buildings and their equipment. Not only the temperature, but also the exposure time have considerable influence on the effect. Dust must be removed before the insect heat treatment.

Depending on the local conditions and requirements, it is necessary to use insect heat treatment equipment with ATEX approval.

Contact